Guide · 5 steps
Reviewing unknowns and compiler evidence
Use severity, source locators and dispositions to turn generated findings into accountable engineering decisions.
Reviewed by WorldIR Engineering · Updated 26/08/2026
1. Wait for the fixed report
Review opens after ingest, compile, graph, extraction, indexing and report stages publish one atomic revision boundary.
2. Start with blockers
Blockers prevent approval until resolved or deliberately dismissed. Warnings and information remain important but represent different decision thresholds.
3. Inspect the locator
Read the generated detail and its asset, entity or report locator. A concise title is navigation, not the complete argument.
4. Record a disposition
Resolution states what changed or which evidence settled the finding. Dismissal states why the finding does not apply. Both require a reason; neither deletes the original observation.
5. Approve the revision
An owner or admin approves only after open blockers reach zero. Approval records the person and time against the immutable revision.